過去ログ

                                Page  744695
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
   通常モードに戻る  ┃  INDEX  ┃  ≪前へ  │  次へ≫   
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
 ▼BuildConstruct  Icotodors 13/6/28(金) 1:49

 ───────────────────────────────────────
 ■題名 : BuildConstruct
 ■名前 : Icotodors <deposlatid243@yandex.ru>
 ■日付 : 13/6/28(金) 1:49
 ■Web : http://besttech.comlu.com
 -------------------------------------------------------------------------
   Nowhere was this situation more obviously a potential danger than at the tie-ins between the existing and new warehouses (pictured right). To create the http://bestbeton.netne.net tie-ins we cut six 24' x 18' holes in the existing wall. These cuts took place directly next to high traffic pathways for warehouse vehicles and employees; these employees had no experience dealing with the dangers associated with concrete demolition and removal. To ensure everyone's safety we created temporary dust walls and flagged off additional areas in the existing warehouse and briefed our subcontractors' workers to watch for Mouser employees who may try to circumvent our safety barriers. The construction safety measures worked and we experienced no incidents or close calls during the process.
Through the use of creative construction techniques we were able to deliver this project with no lost time to Mouser's operations and no injuries to their employees or our subcontractors. http://supermonolit.comze.com The client's initial plan was for us to do the shell, and they would bid out the finish-out. Based on the relationship http://ander.uphero.com we established and their experience with us performing the shell construction, the client chose to negotiate the finish-out with us rather than bid it out. They have since retained us to do additional finish-out work in the existing building under a separate contract.
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━    通常モードに戻る  ┃  INDEX  ┃  ≪前へ  │  次へ≫    ━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━                                 Page 744695