過去ログ

                                Page  318009
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
   通常モードに戻る  ┃  INDEX  ┃  ≪前へ  │  次へ≫   
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
 ▼paul smith outlet b  woodhzor 11/12/15(木) 23:52

 ───────────────────────────────────────
 ■題名 : paul smith outlet b
 ■名前 : woodhzor <wweirui3@gmail.com>
 ■日付 : 11/12/15(木) 23:52
 ■Web : http://www.ghds-outlet.co.uk
 -------------------------------------------------------------------------
   Recently, some people have told reporters reflect Xishan District of Wuxi Tong Street paul smith sale paul smith sale g Northeast in 2008, the bridge at the end of the transformation, the new bridge on the old farm Pan River turned into a concrete bridge, the bridge was completed last year and a formal agreement to put to use. But now, the local paul smith online n government has really started to build a new Chaiqiao largest bridge. Because less than two years on the demolition of the reconstruction? Why can not predict paul smith outlet e how long the bridge is not enough? The locals have paul smith online paul smith online c filled a lot of questions.


 Reporters learned that the department is Xishan Chaiqiao paul smith outlet paul smith outlet l Water Conservancy Bureau. Yesterday, the Office of Air China in the Qin told reporters, bridges concrete proposals eliminated last year for the implementation of the river city, with a total investment of more than 7,400 yuan. The works include improving existing integrated river, which extends from the dredging of the river, the removal of the old bridge, so that the role is to improve flood paul smith sale b control in the city of Wuxi circle. Remove the concrete bridge is part of the project, plans to expand the original 15 meters to 25 meters from the mouth and improve the capacity of the river flow. Huake Chang said that the concrete bridge Wan Chai will be the original bridge over the river a space of 25 feet.


 Zhur Xu Tong said when the bridge in 2009, not yet determined. He told reporters that the second half of 2008 Paul Smith Mini Cooper, Xishan District, uniform bridge inspection of the region, farmers simply new bridge over the river identified as a dangerous bridge, through consultation with relevant departments and experts, Tong Street, North-East, which began in late 2008 for concrete bridges. At this point, the width of the river is 15 meters, so that the concrete bridge length is 15 meters at a cost of $ 20 million. Questions relating to the period of bridge Xuzhu Ren explained, was more important, even if the staff of the water conservation suggests 15 m span of the bridge may not be sufficient, but in terms of increasing the number m, no one could answer, but decided to expand the starting point.


 stakeholders pointed out that the rapid development of Wuxi, the last two years, once had Jincheng Road, Lake Avenue and excavations in different years, and various fixes. Whenever the relevant departments have the solution to this problem requires government departments to improve harmonization, a most careful planning and development of the city.
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━    通常モードに戻る  ┃  INDEX  ┃  ≪前へ  │  次へ≫    ━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━                                 Page 318009